MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program., This news data comes from:http://www.jyxingfa.com
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
ERC amends net-metering rules to expand renewable energy options

Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- First millennial saint: Vatican to canonize 'God's Influencer' Carlo Acutis
- Pope Leo meets LGBTQ+ Catholic advocate and vows continuity with Pope Francis' legacy of welcome
- Strikes across Gaza Strip kill at least 31 as international scholars accuse Israel of genocide
- Ukraine's children start new school year in underground classrooms to avoid Russian bombs
- Sara mum, but brother thinks Torre removal due to PNP's 'internal conflicts'
- PH economic losses hit 100B from corruption in flood control projects
- Marcos halts flood control budget; new commission to investigate expected 'in 48 hours'
- 'Lannie' exits PH — Pagasa
- Magnitude 5.1 earthquake rattles Surigao del Sur
- Israel ups pressure on Gaza City as Trump talks post-war plan